MOT Type 1: what it is, where it goes, and how it is priced
What it actually is
"MOT" comes from the old Ministry of Transport specification. Type 1 is a well-graded crushed rock, concrete or slag: a continuous spread of particle sizes so the smaller fragments fill the voids between larger ones. That grading is the whole point — it is what lets the layer compact to something that carries load and does not move.
Type 1, Type 3 and recycled
| Material | Character | Typically used for |
|---|---|---|
| Type 1 | Well graded, fines included, compacts dense | Roads, driveways, car parks, slab sub-base |
| Type 3 | Open graded, reduced fines, free draining | Where drainage through the layer matters |
| Recycled Type 1 | Crushed concrete and masonry | Cost-sensitive fill where spec allows |
| 6F2 | Coarse crushed fill | Bulk filling, capping layers |
Recycled material is considerably cheaper and entirely appropriate in many situations — but the specification governs. Substituting it into a spec that calls for primary aggregate is not a saving, it is a defect waiting for an inspection.
How much do you need?
Volume first, then weight. Area in square metres, multiplied by compacted depth in metres, gives cubic metres. Compacted Type 1 is commonly taken at roughly two tonnes per cubic metre for ordering purposes — confirm with your supplier, since it varies by source rock.
A worked example: 100m² at 150mm compacted depth is 15m³, so roughly 30 tonnes. Allow for the material consolidating during compaction — ordering to the exact calculated figure tends to leave you short.
Why two quotes differ by more than they should
Type 1 is heavy and low in value per tonne, so haulage is a large share of what you actually pay. The nearest quarry or depot frequently beats a cheaper headline rate once it is on the ground. Order volume, account terms and how recently the rate was agreed do the rest — covered in full in materials and procurement.
That is why a delivered price and a list price are different things, and why comparing headline rates between suppliers is close to meaningless without knowing where each is coming from.
We supply Type 1, Type 3, recycled Type 1 and 6F2 to site through vetted suppliers at the rate quoted, and price sub-base laid and compacted where the job needs the whole package rather than a delivery. To see what a job's sub-base comes to, run the quantities through the BOQ pricer.
Read next
- Materials & procurement — the full guide
Need a delivered price?
Quantities, site postcode and dates. We will come back with a supply price or an introduction to suppliers who can hold it.