Supply-only vs supply-and-fix: the difference that loses money

Supreme Building Services · in Construction estimating

A supply-only rate is the material delivered to site and nothing else. A supply-and-fix (composite) rate covers the material, the labour, and everything the operation drags with it. For a drain run, supply-and-fix includes the trench excavation, bedding, pipe surround and backfill — not just the pipe. Pricing a delivered tonne as though it were laid is one of the fastest ways to win a job and lose money on it.

The same item, two very different numbers

Take a below-ground drain run. Supply-only is the pipe and fittings tipped at the gate. Supply-and-fix is a sequence: set out, excavate the trench, support it, lay bedding, lay and joint the pipe, surround it, backfill, compact, and cart away the surplus.

The material can be a small fraction of the composite rate. Everything else is plant, labour, time and disposal — and none of it appears in a merchant's price list.

Where the confusion comes from

Bills do not always spell it out in the line description. The definition usually sits in the preamble, which states what rates are deemed to include. Two bills for near-identical work can allocate the same operations completely differently — one folds excavation into the drainage rate, the other measures excavation as its own line.

If you price the second bill's drainage rate as though it were the first bill's, you have either double-counted the excavation or missed it entirely. Both are wrong; one of them is expensive.

How to check before you price

Why our rate card keeps them apart

Our element rate card holds the two bases separately and labels which one each line used — "material supplied loose to site" or "composite supply+fix". Merging them would produce a tidier-looking card and a dangerous one, because a delivered tonne would silently price as though it were laid and compacted.

When you run a bill through the BOQ pricer, each priced line shows its basis alongside the figure, so you can see which is which. More on how the bands work in the estimating guide, and on reading the bill itself in what a Bill of Quantities is.

← Back to Construction estimating

Want a second pair of eyes on a bill?

Send it over. We will tell you what basis it expects and where the risk sits before you price it.

Or email [email protected] · Supreme Building Services Ltd, company number 10095179.